- HOME BUILDING STEP-BY-STEP -
BEFORE YOU CHOOSE A BUILDER
BUILDER SELECTION PROCESS
CONSTRUCTION TIMELINE
DECISIONS, DECISIONS, DECISIONS
 

Planning and building a unique custom home that fits your family's needs takes time because so many variables exist, from the size and finishing details of the house to the weather. As a result, it is difficult to pinpoint the exact construction time at the beginning of a project.

We are always eager to complete a project in a timely fashion, but we never take shortcuts to complete work more quickly than it should take if done properly.

To illustrate the many variables that affect the length of a new home construction process, in Central Indiana or elsewhere, the timeline below outlines the stages and steps involved, and the basic order in which they occur.

Planning

  1. Home site selection
  2. House plans development / design
  3. Develop house specifications
  4. Estimate costs and set price of home
  5. Home building contract

Approvals

  1. Secure financing (construction loan)
  2. Acquire permits to build
  3. Developer / homeowner association approval (if required)

Home Building - Foundation & Frame

  1. Staking for foundation work
  2. Tree clearing (if necessary)
  3. Excavation / setting grade (yard levels)
  4. Foundation / backfill dirt
  5. Frame, windows, exterior doors, exterior trim, and siding

Home Building - Exterior

  1. Exterior painting
  2. Roofing
  3. Utilities: electric main trenching, gas main trenching, water main and sewer installation, septic field and well water system (if applicable)
  4. Brick and stone exterior
  5. Gutters and brick flashing
  6. Exterior concrete (drives, walks, patios)
  7. Grading of yard

Home Building - Interior

  1. Heating and cooling rough-in
  2. Plumbing rough-in
  3. Electrical rough-in / alarm / stereo audio system
  4. Central vacuuming rough-in (if applicable)
  5. Insulation
  6. Inspections
  7. Drywall
  8. Paint ceiling and prime paint walls
  9. Sand sub-floor, cabinets, interior trim and countertops
  10. Drywall touch-ups
  11. Painting
  12. Flooring
  13. Mechanical finishes
  14. Bath hardware and closet shelving
  15. Appliances

Construction Project Completion

  1. Cleaning
  2. Final builder and municipal inspections / home presentation / walk-through
  3. Closing

* Name 

 
 

* Phone 

 
 

* E-mail 

 

 

 

Take the First Step - Contact Us

To learn more about having Madison Custom Homes Inc. build for you in Central Indiana, call 317-363-3242 or send us an email or submit the short form to the right.

Indiana Home Building Construction Timeline: Planning, Approvals, Foundation, Frame, Exterior, Interior, Roofing, Landscaping, Inspections, Closing

   