Planning and building a unique custom home that fits your family’s needs takes time because so many variables exist, from the size and finishing details of the house to the weather. As a result, it is difficult to pinpoint the exact construction time at the beginning of a project.
We are always eager to complete a project in a timely fashion, but we never take shortcuts to complete work more quickly than it should take if done properly.
To illustrate the many variables that affect the length of a new home construction process, in Central Indiana or elsewhere, the timeline below outlines the stages and steps involved, and the basic order in which they occur.
Planning
- Home site selection
- House plans development / design
- Develop house specifications
- Estimate costs and set price of home
- Survey-developed site plan / plot plan
- Home building contract
Approvals
- Secure financing
- Acquire permits to build
- Developer / homeowner association approval (if required)
Home Building – Foundation & Frame
- Staking for foundation work
- Tree clearing (if necessary)
- Excavation / setting grade (yard levels)
- Foundation / backfill dirt
- Frame, windows, exterior doors, exterior trim, and siding
Home Building – Exterior
- Exterior painting
- Roofing
- Utilities: electric main trenching, gas main trenching, water main and sewer installation, septic field and well water system (if applicable)
- Brick and stone masonry exterior
- Gutters and brick flashing
- Exterior concrete (drives, walks, patios)
- Grading of yard
Home Building – Interior
- Heating and cooling rough-in
- Plumbing rough-in
- Electrical rough-in / alarm / stereo audio system / home network connectivity
- Central vacuuming rough-in (if applicable)
- Insulation
- Inspections
- Drywall
- Cabinets, interior trim and countertops
- Painting
- Flooring
- Mechanical finishes
- Fixtures and finishes
- Appliances
Construction Project Completion
- Cleaning
- Final builder and municipal inspections / home presentation / walk-through
- Closing
- Move in